CISCO SAN JOSE LAB EXPANSION

Category

San Jose, CA

CH Reynolds was chosen by Cisco for a project consisting of the engineering, design, and construction of a 10,000-square-foot, new High-Density Rack Lab on the first floor of Cisco Building 1, located in San Jose, Calif.

The coordination and communication necessary for this project’s success required the utmost attention to detail. Shutdowns would also be an added challenge.

Construction included the installation of three 750 KVA transformers, three 2500A distribution boards, 800 feet of 225A Starline busway, 1500 feet of redi-rail cable tray, and new lighting.

“This was a fast-track design build project, but CH Reynolds proved to be the perfect, detail-oriented fit for the project. Shutdowns were accomplished as required with no problems”. – Cisco Systems